Calculation of the fulfillment of the nutrient input ceilings
by 2017
Tables A and B
illustrate
the
fulfillment
of
the nutrient input ceilings
(NICs),
based on estimated inputs in
2017. The
tables also provide data on estimated nutrient inputs in 2014 and corresponding assessment of
achieving the NICs.
Further
the
tables
illustrate the effect of reallocation of
extra reduction
to
neighbouring
sub-basins,
where it is applicable. The information
on
remaining reduction to
achieve the
NICs, taking into account
the
uncertainty
of
estimation,
is included.
Abbreviation used:
-
-
-
-
-
-
-
-
-
-
-
-
BOB = Bothnian Bay
BOS = Bothnian Sea
BAP = Baltic Proper
GUF = Gulf of Riga
GUR = Gulf of Riga
DS = Danish Straits
KAT = Kattegat
BSS = Baltic Sea shipping
OC = Countries not being HELCOM Contracting Parties and sources outside the catchment area of
HELCOM Contracting Parties
NIC = nutrient input ceilings (og total nitrogen and total phosphorus, respectively)
TN = total nitrogen
TP = total phosphorus