1) Level of the energy savings requirement to be achieved over the whole period fr
1.a) Basis to calculate the savings requirement
Final energy consumption for the three most recent years available prior to January 2019
Link to FEC data on Eurostat:
Year
(change the years of the series if most recent years not available yet)
Final Energy Consumption (FEC)
1.b) Total cumulative amount of end-use energy savings to be achieved for 2021-2030 (Article 7(1)(b))
Rate of new annual final energy savings (as specified in point b of article 7(1))
Total cumulative amount of end-use energy savings to be achieved for 2021-2030
(as
specified in point b of article 7(1))
National savings objective for 2021-2030 under article 7
(if different from the savings
requirement specified in article 7(1))
In case the national savings objective is different from the savings requirement, please provide explanations
1.c) Complementary explanations
Datasource used to calculate the basis for the savings requirement (if different from Eurostat):
Related justifications and explanations of differences with Eurostat data:
Useful information
Possibility to phase the savings requirement over the obligation period 2021-2030 (article 7(1)
Use the table below
IF
the calculation of the savings requirement:
- takes into account
different rates
of expected new annual savings
over the
years,
OR
- takes into account a
decline of the energy savings over the years
(point (i) of
Annex V(2)) (e.g. if a discount factor is used)
Expected end-use energy savings (in ktoe)
Expected savings from individual actions installed/implemented in 2021
Expected savings from individual actions installed/implemented in 2022
Expected savings from individual actions installed/implemented in 2023
Expected savings from individual actions installed/implemented in 2024
Expected savings from individual actions installed/implemented in 2025
Expected savings from individual actions installed/implemented in 2026
Expected savings from individual actions installed/implemented in 2027
Expected savings from individual actions installed/implemented in 2028
Expected savings from individual actions installed/implemented in 2029
Expected savings from individual actions installed/implemented in 2030
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0002.png
Savings requirement for 2021-2030:
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0003.png
over the whole period from 1 January 2021 to 31 December 2030
January 2019
https://ec.europa.eu/eurostat/web/products-datasets/-/t2020_34
2016
2017
2018 Average
Unit
14440,62
14619,76
14669,91 14576,7633 ktoe/year
or 2021-2030 (Article 7(1)(b))
0,8%
Note: to be changed to 0.24% for Cyprus and Malta
6413,77587 ktoe
ktoe
Note: according to amended EED article 7(2), the adopted target should not be less than the
nt, please provide explanations in next tab "2-Target_details"
nt from Eurostat):
od 2021-2030 (article 7(1)
Expected
annual
savings in
2021
116,56
Expected
annual
savings in
2022
116,56
116,56
Expected
annual
savings in
2023
116,56
116,56
116,56
Expected
annual
savings in
2024
116,56
116,56
116,56
116,56
Expected
annual
savings in
2025
116,56
116,56
116,56
116,56
116,56
Expected
annual
savings in
2026
116,56
116,56
116,56
116,56
116,56
116,56
Expected
annual
savings in
2027
116,56
116,56
116,56
116,56
116,56
116,56
116,56
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0004.png
Total
expected
annual
savings in
2021
116,56
Total
expected
annual
savings in
2022
233,12
Total
expected
annual
savings in
2023
349,68
Total
expected
annual
savings in
2024
466,24
Total
expected
annual
savings in
2025
582,8
Total
expected
annual
savings in
2026
699,36
Total
expected
annual
savings in
2027
815,92
6410,8 ktoe
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0005.png
rget should not be less than the reference target
Expected
annual
savings in
2028
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
Expected
annual
savings in
2029
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
Expected
annual
savings in
2030
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
116,56
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0006.png
Total
expected
annual
savings in
2028
932,48
Total
expected
annual
savings in
2029
1049,04
Total
expected
annual
savings in
2030
1165,6
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0007.png
References to
points in Annex
III of GOV
3.2) Alternative policy measures referred to in Article 7b and Article 20(6) (
including information about 4) Calculation methodology and 5) Monitoring and Ve
[Duplicate this tab if there are several alternative measures to notify. / Delete this tab
3.2.a) to 3.2.b) General information
Title of the policy measure
3.2.a) Type of policy measure
3.2.a) Short description of the policy measure
(including design features)
Useful
Budget planned or estimated
information
Source(s) of information
(including the reference of the related law
or other legal text(s))
3.2.c) Expected savings for 2021-2030 and intermediate period(s) (point 5(d) of Annex V)
Expected cumulative end-use energy savings
Expected new annual end-use energy savings and/or amount of
energy savings in relation to any intermediate periods
Intermediate period(s), where relevant
Useful
Complementary explanations
(when relevant)
information
3.2.d) to 3.2.g) 3.2.d) to 3.2.g) Key design features
Implementing public authorities, participating or entrusted parties
3.2.d) and their responsibilities for implementing the policy measure
(points 3(b) and 5(b) of Annex V)
3.2.e) Target sectors
(point 5(c) of Annex V)
Individual actions eligible to the alternative measure
(point 5(f) of
3.2.f)
Annex V)
and corresponding lifetimes
(points 2(i) and 5(h) of Annex
V)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0008.png
3.2.g)
Specific policy measures or individual actions targeting energy
poverty
(where applicable)
4) Calculation methodology (requirements related to Annex V)
4.a) to 4.c) 4.a) to 4.c) General information about the calculation methodology
4.a) Measurement method(s) used
(point 1 of Annex V)
Metric(s) used to express the energy savings (primary or final
4.b)
energy savings)
(point 3(d) of Annex V)
4.c)
How lifetimes (and possible changes in savings over time) are taken
into account in savings calculations
(points 2(i) and 5(h) of Annex V)
Approach used to take into account the lifetime of savings and
main datasources used to calculate the savings
Other sources of information or references (e.g. studies, evaluation
Useful
reports) where more explanations and details about the savings
information
calculations can be found
4.d) Additionality and materiality (requirements related to point 5(g) of Annex V)
Brief description of the calculation methodology; including how is
additionality taken into account in the calculation methodology?
(Annex V(2))
Does the policy measure promote early replacements? If so, how is
it taken into account in the calculation of the savings?
(point 2(f) of
Annex V)
Benchmarks used for deemed and scaled savings
(in case deemed
or scaled savings are used) (point 1(c) of Annex V)
How is materiality of savings ensured?
(point 3(h) of Annex V)
4.e) Possible overlaps (between policy measures and between individual actions) and double coun
Possible overlaps between individual actions eligible to the EEO
scheme
Possible overlaps between the EEO scheme and alternative
measure(s) reported to Article 7
How are possible overlaps
(between the EEO scheme and
alternative measures)
addressed to avoid any double counting of
energy savings?
(point 3(g) of Annex V)
4.f) Climatic variations (where relevant) (points 2(h) and 5(i) of Annex V)
Are the climatic variations between regions? And can they affect
the actions eligible to the policy measure?
(where relevant) How climatic variations are addressed in savings
calculations?
5) Monitoring and verification (M&V) of savings (point 5(j) of Annex V)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0009.png
5.a)
Brief description of the monitoring & verification system and of the
process of verification
5.b) Authorities responsible for the M&V of the policy measure
Independence of the M&V from the participating or entrusted
5.c)
parties
(point 2 of article 7b)
5.d)
5.f)
Verification of statistically representative samples
(point 2 of
Article 7b)
Publication of energy savings achieved each year under the policy
measure
(point 3(e) of Annex V)
Penalties applied in case of non-compliance
(and related references,
5.g)
including the law or other legal texts setting the penalties and
related conditions)
Provision(s) in case the progress of the policy measure is not
5.h)
satisfactory
(point 3(f) of Annex V)
Information about quality standards (point 2(g) of Annex V )
Useful
How are quality standards (for products, services and installation of
information
measures) promoted or required by the policy measure?
Complementary information or explanations (optional)
Useful
Mention here any other information of explanation that can be
information
useful for experience sharing
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0010.png
in Article 7b and Article 20(6) (except taxation measures)
ethodology and 5) Monitoring and Verification
e measures to notify. / Delete this tab if no alternative measure is planned for 2021-2030]
Competitive subsidy scheme related to private enterprises
Subsidy scheme
The scheme allocates DKK 300 million for each year in the period 2021-2024. The scheme is planned
to be implemented as a subsidy scheme with a competitive bidding procedure. Subsidy is granted
based on the ratio of subsidy per saved kWh in the individual projects. Subsidies are first granted to
the project with the lowest costs per saved kWh, then to the one representing the second lowest
costs, and so forth. The scheme is aimed at achieving energy savings in businesses, and is open to
energy saving projects in all types of energy in all private sectors in Denmark and all types of
activities in Denmark
dkk 300 mio. per year in 2021-2024
A proposal to the legal basis (change of law) will be submitted to the Parliament i February 2020.
riod(s) (point 5(d) of Annex V)
983,1
28,9
The scheme is scheduled to end in 2024
The expected saving is calculated from a frozen policy scenario, where instruments and actions from
the Energy Agreement from June 2018, from the energy policy agreement of March 2012 and
subsequent adjustments are included. The Energy Agreement from June 2018 includes new energy
efficiency measures in the period 2021-2024. In 2024 a stocking will take place and the need for
new measures will be evaluated.
Danish Energy Agency
Energy saving projects in all types of energy in all private sectors in Denmark and all types of
activities in Denmark including: Industry/manufacturing, agriculture, fisheries, forestry, horticulture,
construction and manufacturing, energy in private service and retail
The scheme targets energy savings in industry. The full list of eligible individual actions, that can
recieve aid under the scheme will be finalized in 2020.
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0011.png
Not applicable
ted to Annex V)
n methodology
A mix of deemed savings and metered savings based on the before and after situation.
Final energy savings
All eligible individual actions must be placed in a lifetime category at the time of application for aid.
The lifetimes are set beforehand by the DEA on basis of independant studies and reflect lifetimes of
actions in industry, when taking the lifetime of the replaced equipment and additionality in to
account.
Savings are calculated on the basis of data for all the individual actions
to point 5(g) of Annex V)
The direct calculated savings are reduced by a additionality factor of 50 pct. However this metode is
still undergoing further validation. It is not expected, that the validation proces will lower the
additionality factor and thus the final end-use energy savings
ween individual actions) and double counting
The administation system will secure that the same project cannot be counted twice.
Not relevant
Not relevant
5(i) of Annex V)
The small geographical scope of Denmark (42.933 km2) limits the possible climatic variations.
s (point 5(j) of Annex V)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0012.png
The system for monitoring and verifation will be finalized in 2020 as part of the legislative proces for
the scheme.
The aid will be granted to the recipients based on the calculated energy savings, so that aid is
granted based on the amount of generated kWh over the lifetime of the energy saving. Savings are
calculated by using standard values for the lifetimes of the eligible actions. These standard values
are set by the DEA. The DEA asseses each application and grants the aid. The aid is paid out after the
completion of the energy savings project, and after the applicant has provided sufficient
documentation hereof.
Danish Energy Agency
The M&V is carried out by the DEA.
Each application will be assessed by the DEA. Before payment of the aid, the applicant must provide
sufficient documentation for the completion of the project. The DEA will review this documentation
for each project.
Plan for publication of the results of the scheme will be finalized in 2020 as part of the legislative
proces for the scheme.
The system for monitoring and verifation will be finalized in 2020 as part of the legislative proces for
the scheme.
Plan for evaluation and any additional meassures will be finalized in 2020 as part of the legislative
proces for the scheme.
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0013.png
ktoe
ktoe/year
(in
case of changes over time
)
Expected new annual end-use
energy savings (in ktoe/y)
2021
2022
28,9
28,9
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0014.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0015.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0016.png
2023
2024
2025
2026
2027
2028
2029
2030
28,9
28,9
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0017.png
References to
points in Annex
III of GOV
3.2) Alternative policy measures referred to in Article 7b and Article 20(6) (
including information about 4) Calculation methodology and 5) Monitoring and Ve
[Duplicate this tab if there are several alternative measures to notify. / Delete this tab
3.2.a) to 3.2.b) General information
Title of the policy measure
3.2.a) Type of policy measure
3.2.a) Short description of the policy measure
(including design features)
Useful
Budget planned or estimated
information
Source(s) of information
(including the reference of the related law
or other legal text(s))
3.2.c) Expected savings for 2021-2030 and intermediate period(s) (point 5(d) of Annex V)
Expected cumulative end-use energy savings
Expected new annual end-use energy savings and/or amount of
energy savings in relation to any intermediate periods
Intermediate period(s), where relevant
Useful
Complementary explanations
(when relevant)
information
3.2.d) to 3.2.g) 3.2.d) to 3.2.g) Key design features
Implementing public authorities, participating or entrusted parties
3.2.d) and their responsibilities for implementing the policy measure
(points 3(b) and 5(b) of Annex V)
3.2.e) Target sectors
(point 5(c) of Annex V)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0018.png
Individual actions eligible to the alternative measure
(point 5(f) of
3.2.f)
Annex V)
and corresponding lifetimes
(points 2(i) and 5(h) of Annex
V)
Specific policy measures or individual actions targeting energy
3.2.g)
poverty
(where applicable)
4) Calculation methodology (requirements related to Annex V)
4.a) to 4.c) 4.a) to 4.c) General information about the calculation methodology
4.a) Measurement method(s) used
(point 1 of Annex V)
4.b)
4.c)
Metric(s) used to express the energy savings (primary or final
energy savings)
(point 3(d) of Annex V)
How lifetimes (and possible changes in savings over time) are taken
into account in savings calculations
(points 2(i) and 5(h) of Annex V)
Approach used to take into account the lifetime of savings and
main datasources used to calculate the savings
Other sources of information or references (e.g. studies, evaluation
Useful
reports) where more explanations and details about the savings
information
calculations can be found
4.d) Additionality and materiality (requirements related to point 5(g) of Annex V)
Brief description of the calculation methodology; including how is
additionality taken into account in the calculation methodology?
(Annex V(2))
Does the policy measure promote early replacements? If so, how is
it taken into account in the calculation of the savings?
(point 2(f) of
Annex V)
Benchmarks used for deemed and scaled savings
(in case deemed
or scaled savings are used) (point 1(c) of Annex V)
How is materiality of savings ensured?
(point 3(h) of Annex V)
4.e) Possible overlaps (between policy measures and between individual actions) and double coun
Possible overlaps between individual actions eligible to the EEO
scheme
Possible overlaps between the EEO scheme and alternative
measure(s) reported to Article 7
How are possible overlaps
(between the EEO scheme and
alternative measures)
addressed to avoid any double counting of
energy savings?
(point 3(g) of Annex V)
4.f) Climatic variations (where relevant) (points 2(h) and 5(i) of Annex V)
Are the climatic variations between regions? And can they affect
the actions eligible to the policy measure?
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0019.png
(where relevant) How climatic variations are addressed in savings
calculations?
5) Monitoring and verification (M&V) of savings (point 5(j) of Annex V)
5.a)
Brief description of the monitoring & verification system and of the
process of verification
5.b) Authorities responsible for the M&V of the policy measure
Independence of the M&V from the participating or entrusted
5.c)
parties
(point 2 of article 7b)
5.d)
5.f)
Verification of statistically representative samples
(point 2 of
Article 7b)
Publication of energy savings achieved each year under the policy
measure
(point 3(e) of Annex V)
Penalties applied in case of non-compliance
(and related references,
5.g)
including the law or other legal texts setting the penalties and
related conditions)
Provision(s) in case the progress of the policy measure is not
5.h)
satisfactory
(point 3(f) of Annex V)
Information about quality standards (point 2(g) of Annex V )
Useful
How are quality standards (for products, services and installation of
information
measures) promoted or required by the policy measure?
Complementary information or explanations (optional)
Useful
Mention here any other information of explanation that can be
information
useful for experience sharing
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0020.png
in Article 7b and Article 20(6) (except taxation measures)
ethodology and 5) Monitoring and Verification
e measures to notify. / Delete this tab if no alternative measure is planned for 2021-2030]
Competitive subsidy scheme related buildings
Subsidy scheme
The subsidy scheme related to buildings allocates DKK 200 million for each year in the
period 2021-2024. The scheme is planned to be implemented as a competitive based
subsidy scheme aimed at achieving energy savings in buildings.
Financial aid will be given to owners of buildings who have renovated their buildings in
accordance with a specific list of energy savings belonging to the subsidy scheme. In order
to achieve as much savings as possible the projects will compete in relation to the amount of energy
savings per square meter in the application. Furthermore the energy label for
buildings is planned to be used in the scheme, and data from the label used for
documentation. To help realization of energy savings in private buildings there will also be
focus on campaigns aiming at support realizing the potential for energy savings.
dkk 200 mio. per year in 2021-2024
A proposal to the legal basis (change of law) will be submitted to the Parliament i February 2020.
riod(s) (point 5(d) of Annex V)
241,4
7,165
The scheme is scheduled to end in 2024
The expected saving is calculated from a frozen policy scenario, where instruments and actions from
the Energy Agreement from June 2018, from the energy policy agreement of March 2012 and
subsequent adjustments are included. The Energy Agreement from June 2018 includes new energy
efficiency measures in the period 2021-2024. In 2024 a stocking will take place and the need for
new measures will be evaluated.
Danish Energy Agency
Buildings
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0021.png
The scheme targets energy savings in existing residential buildings. The full list of eligible individual
actions, that can recieve aid under the scheme will be finalized in 2020.
Not applicable
ted to Annex V)
n methodology
Deemed savings calcultated on the basis of data for u-value etc. before and after for the actual
actions
Final energy saving
The scheme have focus on building renovation, where the lifetime in genereal is 20 year or more.
No change in savings over lifetime
Savings are calculated on the basis of data for all the individual actions
to point 5(g) of Annex V)
The direct calculated savings are reduced by a additionality factor of 50 pct. However this metode is
still undergoing further validation. It is not expected, that the validation proces will lower the
additionality factor and thus the final end-use energy savings
No
The actual performance (U-value, etc.) for the actual building element
Only savings which get a subsidy from the scheme. The implementation of the savings can not begin
before the building owner has been promised a subsidy from the Government.
ween individual actions) and double counting
The administation system will secure that the same project cannot be counted twice.
Not relevant
Not relevant
5(i) of Annex V)
The small geographical scope of Denmark (42.933 km2) limits the possible climatic variations.
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0022.png
s (point 5(j) of Annex V)
The system for monitoring and verifation will be finalized in 2020 as part of the legislative proces for
the scheme.
The aid will be granted to the recipients based on the calculated energy savings, so that aid is
granted based on the amount of generated kWh over the lifetime of the energy saving. Savings are
calculated by using standard values for each eligible individual action. These standard values are set
by the DEA. The DEA asseses each application and grants the aid. The aid is paid out after the
completion of the energy savings project, and after the applicant has provided sufficient
documentation hereof.
Danish Energy Agency
The M&V is carried out by the DEA.
Each application will be assessed by the DEA. Before payment of the aid, the applicant must provide
sufficient documentation for the completion of the project. The DEA will review this documentation
for each project.
Plan for publication of the results of the scheme will be finalized in 2020 as part of the legislative
proces for the scheme.
The system for monitoring and verifation will be finalized in 2020 as part of the legislative proces for
the scheme.
Plan for evaluation and any additional meassures will be finalized in 2020 as part of the legislative
proces for the scheme.
Subsidy will only be given to project who implement the full cost-effective saving potential related
to the actual project.
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0023.png
ktoe
ktoe/year
(in
case of changes over time
)
Expected new annual end-use
energy savings (in ktoe/y)
2021
7,165
2022
7,165
2023
7,165
2024
7,165
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0024.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0025.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0026.png
2025
2026
2027
2028
2029
2030
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0027.png
References to
points in Annex
III of GOV
3.2) Alternative policy measures referred to in Article 7b and Article 20(6) ( except taxation measures)
including information about 4) Calculation methodology and 5) Monitoring and Verification
[Duplicate this tab if there are several alternative measures to notify. / Delete this tab if no alternative measure is planned for 2021-2030]
3.2.a) to 3.2.b) General information
Title of the policy measure
3.2.a) Type of policy measure
3.2.a) Short description of the policy measure
(including design features)
Existing measures related to buildings
Building codes and certification of buildings in combination with information, etc.
Activ information campaigns, knowledgde sharing, activ use of data and digitalisation, etc. in
combination with the requirements in the building codes and the ernergy certification of buildings
will deliver new savings every year
Useful
Budget planned or estimated
information
budget planned or estimated
Annual budget for information, BR18 - Bygningsreglementer 2018 (building code 2018)
http://bygningsreglementet.dk/
3.2.c) Expected savings for 2021-2030 and intermediate period(s) (point 5(d) of Annex V)
Expected cumulative end-use energy savings
Expected new annual end-use energy savings and/or amount of
energy savings in relation to any intermediate periods
Intermediate period(s), where relevant
656,8 ktoe
11,9 ktoe/year
(in
case of changes over time
)
Expected new annual end-use
energy savings (in ktoe/y)
2021
11,9
2022
11,9
2023
11,9
2024
11,9
2025
11,9
2026
11,9
2027
11,9
2028
11,9
2029
11,9
2030
11,9
Useful
Complementary explanations
(when relevant)
information
3.2.d) to 3.2.g) 3.2.d) to 3.2.g) Key design features
Implementing public authorities, participating or entrusted parties
3.2.d) and their responsibilities for implementing the policy measure
(points 3(b) and 5(b) of Annex V)
3.2.e) Target sectors
(point 5(c) of Annex V)
Individual actions eligible to the alternative measure
(point 5(f) of
3.2.f)
Annex V)
and corresponding lifetimes
(points 2(i) and 5(h) of Annex
V)
Specific policy measures or individual actions targeting energy
3.2.g)
poverty
(where applicable)
Danish Energy Agency, Danish Building and Property Agency
Buildings
Reduction of energy consumption for heating og existing buildings. All actions which reduce the
consumption are allowed.
Not applicable
4) Calculation methodology (requirements related to Annex V)
4.a) to 4.c) 4.a) to 4.c) General information about the calculation methodology
Calculated on the basis of data of the reduction of energy consumtion per m2 for heating in
Denmarks Energy and Climate Outlook. The baseline is the consumption per m2 in 2020. The
savings is the difference corrected for the effect of the subsidy scheme for buildings (AltMeasure02)
Final energy savings
4.a) Measurement method(s) used
(point 1 of Annex V)
Metric(s) used to express the energy savings (primary or final
energy savings)
(point 3(d) of Annex V)
4.b)
4.c)
How lifetimes (and possible changes in savings over time) are taken
The saving are calculated as the reduction of consumption every year compared to a baseline with
into account in savings calculations
(points 2(i) and 5(h) of Annex V) constant consumption per m2.
Approach used to take into account the lifetime of savings and
main datasources used to calculate the savings
Other sources of information or references (e.g. studies, evaluation
Useful
reports) where more explanations and details about the savings
information
calculations can be found
4.d) Additionality and materiality (requirements related to point 5(g) of Annex V)
Brief description of the calculation methodology; including how is
The saving are calculated as the reduction of consumption every year compared to a baseline with
additionality taken into account in the calculation methodology?
constant consumption per m2.
(Annex V(2))
Does the policy measure promote early replacements? If so, how is
it taken into account in the calculation of the savings?
(point 2(f) of No
Annex V)
Benchmarks used for deemed and scaled savings
(in case deemed
or scaled savings are used) (point 1(c) of Annex V)
How is materiality of savings ensured?
(point 3(h) of Annex V)
Reduction in actual consumption
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0028.png
4.e) Possible overlaps (between policy measures and between individual actions) and double counting
Possible overlaps between individual actions eligible to the EEO
scheme
Possible overlaps between the EEO scheme and alternative
measure(s) reported to Article 7
How are possible overlaps
(between the EEO scheme and
alternative measures)
addressed to avoid any double counting of
energy savings?
(point 3(g) of Annex V)
The reduction in consumption is corrected for the effect of the subsidy scheme
Not relevant
4.f) Climatic variations (where relevant) (points 2(h) and 5(i) of Annex V)
Are the climatic variations between regions? And can they affect
the actions eligible to the policy measure?
(where relevant) How climatic variations are addressed in savings
calculations?
The small geographical scope of Denmark (42.933 km2) limits the possible climatic variations.
5) Monitoring and verification (M&V) of savings (point 5(j) of Annex V)
5.a)
5.b)
5.c)
5.d)
5.f)
5.g)
5.h)
Brief description of the monitoring & verification system and of the
process of verification
Authorities responsible for the M&V of the policy measure
Independence of the M&V from the participating or entrusted
parties
(point 2 of article 7b)
Verification of statistically representative samples
(point 2 of
Article 7b)
Publication of energy savings achieved each year under the policy
measure
(point 3(e) of Annex V)
Penalties applied in case of non-compliance
(and related
references, including the law or other legal texts setting the
penalties and related conditions)
Provision(s) in case the progress of the policy measure is not
satisfactory
(point 3(f) of Annex V)
Will be based on the development of the actual consumption in the official Danish Energy Statistic.
Danish Energy Agency
Not relevant
Will be based on the development of the total energy consumption for heating
annual report
No
Information about quality standards (point 2(g) of Annex V )
Useful
How are quality standards (for products, services and installation of
information
measures) promoted or required by the policy measure?
Complementary information or explanations (optional)
Useful
Mention here any other information of explanation that can be
information
useful for experience sharing
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0029.png
References to
points in Annex
III of GOV
3.2) Alternative policy measures referred to in Article 7b and Article 20(6) (
including information about 4) Calculation methodology and 5) Monitoring and Ve
[Duplicate this tab if there are several alternative measures to notify. / Delete this tab
3.2.a) to 3.2.b) General information
Title of the policy measure
3.2.a) Type of policy measure
3.2.a) Short description of the policy measure
(including design features)
Useful
Budget planned or estimated
information
Source(s) of information
(including the reference of the related law
or other legal text(s))
3.2.c) Expected savings for 2021-2030 and intermediate period(s) (point 5(d) of Annex V)
Expected cumulative end-use energy savings
Expected new annual end-use energy savings and/or amount of
energy savings in relation to any intermediate periods
Intermediate period(s), where relevant
Useful
Complementary explanations
(when relevant)
information
3.2.d) to 3.2.g) 3.2.d) to 3.2.g) Key design features
Implementing public authorities, participating or entrusted parties
3.2.d) and their responsibilities for implementing the policy measure
(points 3(b) and 5(b) of Annex V)
3.2.e) Target sectors
(point 5(c) of Annex V)
Individual actions eligible to the alternative measure
(point 5(f) of
3.2.f)
Annex V)
and corresponding lifetimes
(points 2(i) and 5(h) of Annex
V)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0030.png
3.2.g)
Specific policy measures or individual actions targeting energy
poverty
(where applicable)
4) Calculation methodology (requirements related to Annex V)
4.a) to 4.c) 4.a) to 4.c) General information about the calculation methodology
4.a) Measurement method(s) used
(point 1 of Annex V)
Metric(s) used to express the energy savings (primary or final
energy savings)
(point 3(d) of Annex V)
How lifetimes (and possible changes in savings over time) are taken
into account in savings calculations
(points 2(i) and 5(h) of Annex V)
4.b)
4.c)
Approach used to take into account the lifetime of savings and
main datasources used to calculate the savings
Other sources of information or references (e.g. studies, evaluation
Useful
reports) where more explanations and details about the savings
information
calculations can be found
4.d) Additionality and materiality (requirements related to point 5(g) of Annex V)
Brief description of the calculation methodology; including how is
additionality taken into account in the calculation methodology?
(Annex V(2))
Does the policy measure promote early replacements? If so, how is
it taken into account in the calculation of the savings?
(point 2(f) of
Annex V)
Benchmarks used for deemed and scaled savings
(in case deemed
or scaled savings are used) (point 1(c) of Annex V)
How is materiality of savings ensured?
(point 3(h) of Annex V)
4.e) Possible overlaps (between policy measures and between individual actions) and double coun
Possible overlaps between individual actions eligible to the EEO
scheme
Possible overlaps between the EEO scheme and alternative
measure(s) reported to Article 7
How are possible overlaps
(between the EEO scheme and
alternative measures)
addressed to avoid any double counting of
energy savings?
(point 3(g) of Annex V)
4.f) Climatic variations (where relevant) (points 2(h) and 5(i) of Annex V)
Are the climatic variations between regions? And can they affect
the actions eligible to the policy measure?
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0031.png
(where relevant) How climatic variations are addressed in savings
calculations?
5) Monitoring and verification (M&V) of savings (point 5(j) of Annex V)
Brief description of the monitoring & verification system and of the
process of verification
5.b) Authorities responsible for the M&V of the policy measure
Independence of the M&V from the participating or entrusted
5.c)
parties
(point 2 of article 7b)
5.a)
5.d)
5.f)
Verification of statistically representative samples
(point 2 of
Article 7b)
Publication of energy savings achieved each year under the policy
measure
(point 3(e) of Annex V)
Penalties applied in case of non-compliance
(and related references,
5.g)
including the law or other legal texts setting the penalties and
related conditions)
Provision(s) in case the progress of the policy measure is not
5.h)
satisfactory
(point 3(f) of Annex V)
Information about quality standards (point 2(g) of Annex V )
Useful
How are quality standards (for products, services and installation of
information
measures) promoted or required by the policy measure?
Complementary information or explanations (optional)
Useful
Mention here any other information of explanation that can be
information
useful for experience sharing
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0032.png
in Article 7b and Article 20(6) (except taxation measures)
ethodology and 5) Monitoring and Verification
To be updated
e measures to notify. / Delete this tab if no alternative measure is planned for 2021-2030]
Subsidy scheme to replace oil burners with heat pumps in buildings outside the district
heating and gas grids
Subsidy scheme
The subsidy scheme allocates DKK 20 million for each year in the period 2021-2024. The
scheme is planned to be implemented as a subsidy scheme with the objective to replace oil
burners with heat pumps in buildings located in areas without access to district heating or
the gas grid.
dkk 20 mio.
To be updated
riod(s) (point 5(d) of Annex V)
To be updated
To be updated
(Mention
here the categories of individual actions that can receive financial incentives or other types
of support from the alternative measure, or that are promoted by the alternative measure through
regulations, information or any type of policy instrument
+
mention in the tab "4.c-Lifetimes" the lifetime values
assumed for the different types or
categories of actions
)
(in
case the list of action types would be too long, mention here the main eligibility criteria, together
with a link where the list can be found or provide this list as a separate file
)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0033.png
Not applicable
ted to Annex V)
To be updated
(Mention
the methods used according to the typology defined in Annex V(1): (a) deemed savings /
(b) metered savings / (c) scaled savings / (d) surveyed savings. In case another type of method is
used, please explain
.)
Final energy savings
(Add
explanations here, especially if a method different from the one presented in point 2(i) of Annex
V is used
)
n methodology
to point 5(g) of Annex V)
To be updated
(explain
here how the calculation methodology complies with points (a) to (c) of Annex V(2),
including how the effects of EU laws and regulations are taken into account, as required by points
2(b) and 2(c) of Annex V
)
ween individual actions) and double counting
To be updated
(mention
here how such overlaps are taken into account in the savings calculations ; for example
interactions between insulation of walls and replacement of heating system
)
5(i) of Annex V)
To be updated
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0034.png
s (point 5(j) of Annex V)
To be updated
(Explain
here how verification of statistically representative samples of actions is ensured, and the
criteria used to define and select representative samples
)
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0035.png
ktoe
ktoe/year
(in
case of changes over time
)
Expected new annual end-use
energy savings (in ktoe/y)
2021
2022
2023
2024
Energibesp
arelsesproj
ekter
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0036.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0037.png
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0038.png
2025
2026
2027
2028
2029
2030
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0039.png
Information about the lifetime
of the individual actions eligibile
to the policy measures (for
both, EEOS and alternative
measures) reported for article 7
(points 2(i) and 5(h) of Annex V)
End-use sector
Type or category of individual action
Private enterprises support scheme
Buildings support scheme
Existing measures for existing buildings
Subsidy scheme
Subsidy scheme
Variation
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0040.png
Assumed lifetime
value (in years)
Assumptions about possible changes in the
energy savings over time
More then 10
More the 10
10 No change
No change
No change
KEF, Alm.del - 2019-20 - Bilag 144: Orientering om aflevering af Danmarks nationale energi- og klimaplan
2127989_0041.png
Source or method use to estimate the lifetime and
related assumptions
All eligible individual actions must be placed in a lifetime
category at the time of application for aid. The lifetimes
are set beforehand by the DEA on basis of independant
studies and reflect lifetimes of actions in industry, when
taking the lifetime of the replaced equipment and
additionality in to account.
Based on information on the actuel projects
Based on actual reduction of consumption over the periode