Energi- Forsynings- og Klimaudvalget 2017-18
EFK Alm.del Bilag 302
Offentligt
1913508_0001.png
MINI CHP PLANT
CASE STUDY
April 2016
Mini CHP units at a sports centre
Nærum, Denmark
Short description of
the installation
•••
The site
The site is a public sports
center with facilities for
swimming, gym, conference
rooms, and athletics stadi-
um.
The installation
Consists of three mini CHP
units, one brine/water heat
pump and two condensing
The system has a payback time of less than
5 years and reduces the CO
2
emission by approx.
133-200 tonnes per year
gas boilers. The mini CHP
units and heat pump are
combined with heat storage.
The heat pump recovers
heat from the ventilation
outlet and renewable heat
from ground collectors.
Mini CHP units in combination with a heat pump
reduce energy cost and greenhouse gas emission.
With the installation of three
mini CHP units and a heat
pump, the Rundforbi Sports
Centre has successfully re-
duced cost of electricity and
heating while lowering the
greenhouse gas emission by
approx. 133-200 tonnes per
year. The advantage of the
CHPs is mor efficient fuel
use compared to separate
heat and power production.
The implementation of a
heat pump also includes re-
newable energy in the heat-
ing system and has made it
possible to recover waste
heat from the ventilation
system. The payback time for
the complete installation is
less than 5 years.
Operation strategy
The CHP units should pro-
duce as much electricity as
possible, without exceeding
the facilities' simultaneous
own consumption of elec-
tricity. Peak-load boilers are
used if more heat is needed.
EFK, Alm.del - 2017-18 - Bilag 302: Henvendelse af 19/6-18 fra Individuel Energi om fleksibelt elforbrug
1913508_0002.png
MINI CHP PLANT
CASE STUDY
April 2016
The technical part
Plant data for 1 year's operation
-
-
-
-
-
-
Installation year
CHP total operating hours
CHP electricity generation
CHP heat output, approx.
Heat pump heat output
Boiler heat output
2014
18,500 hours
335,000 kWh
736,000 kWh
164,000 kWh
259,000 kWh
Energy flows
Financial data
-
-
Installation cost
Payback time
267,000 EUR
4-5 years
Illustration of the energy flows from
the energy central to the sports facility
Installation data
-
-
-
-
Mini CHP
Heat pump
Gas boiler
Heat storage tanks
Model
EC POWER XRGI 20
Thermia Robust Eco 42
Danstoker
EC POWER
Units
3
1
2
4
Specification
Electricity generation 20 kW per unit
Heat capacity 40 kW per unit
Nominal heat capacity 42 kW
Heat capacity 600 kW per unit (1 spare)
3 x 1000 l for the mini CHP unit
1 x 500 l for the heat pump
MORE INFORMATION: CONTACT
Your local energy company
• Energy advisor •Product supplier
Information collected by
Danish Gas Technology Centre • Dr. Neergaards Vej 5B • 2970 Hørsholm
tel. +45 2016 9600 • www.dgc.dk • [email protected]