Miljøudvalget (MIU) Alm. del

Samling: 2014-15 (1. samling)

Spørgsmål 199

GEUS’ pressemeddelelse af 26. november 2014 giver ikke nogen mening, og det er svært at forholde sig til den, uden at kende den overordnede moniteringsplan (statistisk moniteringsplan). Ifølge direktivet skal der foreligge en plan for hvert “river basin”, og denne skal indeholde “levels of confidence and precision”: ”The groundwater monitoring network shall be established in accordance with the requirements of Articles 7 and 8. The monitoring network shall be designed so as to provide a coherent and comprehensive overview of groundwater chemical status within each river basin and to detect the presence of long-term anthropogenically induced upward trends in pollutants. On the basis of the characterisation and impact assessment carried out in accordance with Article 5 and Annex II, Member States shall for each period to which a river basin management plan applies, establish a surveillance monitoring programme. The results of this programme shall be used to establish an operational monitoring programme to be applied for the remaining period of the plan. Estimates of the level of confidence and precision of the results provided by the monitoring programmes shall be given in the plan.” Vil ministeren redegøre for, hvordan denne direktivtekst korresponderer med GEUS’ pressemeddelelse?
Dato: 08-01-2015
Status: Endeligt besvaret
Emne: vand- og havmiljø

Endeligt svar

Dokumentdato: 14-01-2015
Modtaget: 14-01-2015
Omdelt: 14-01-2015

MIU alm. del - svar på spm. 199 om, at redegøre for, hvordan denne direktivtekst korresponderer med GEUS’ pressemeddelelse af 26. november 2014, fra miljøministeren

Svar på spm. 199 (pdf-version)
Html-version

Udvalgsspørgsmål

Dokumentdato: 08-01-2015
Modtaget: 08-01-2015
Omdelt: 08-01-2015

Spm. om, at redegøre for, hvordan denne direktivtekst korresponderer med GEUS’ pressemeddelelse af 26. november 2014, til miljøministeren

Udvalgsspørgsmål (pdf-version)
Html-version